User Acceptance Test Plan Template (Free, With Examples)

FREE TEMPLATE

Copy this free user acceptance test plan template, fill in the blanks with your project details, and start UAT today. No download form or email required.

KEY TAKEAWAYS

  • A user acceptance test plan template needs eight core parts: purpose, scope, entry and exit criteria, roles, environment, schedule, defect process, and sign-off.
  • Skip the lead form. Copy the free template below straight into a doc or spreadsheet and start filling it in today.
  • A UAT test plan and a UAT test strategy are not the same document. The plan covers execution logistics. The strategy sets the overall testing approach.
  • Simple projects need a one-page plan. Regulated or multi-team software releases need the full version with formal sign-off.
  • A test management tool like Tuskr turns this template into a living document your whole team can update as testing runs, instead of a file that goes stale after week one.

A user acceptance test plan template gives your team a starting point for UAT instead of a blank page. Most projects hit the same moment: the build is almost ready, business stakeholders want proof it works, and nobody has written down who tests what, when, or what counts as a pass.

Searching for a template doesn’t always solve that. Some are locked behind a lead form. Others were built for a university IT office or a 1990s payroll system, full of fields nobody ever fills in. A few are just generic test plans with “UAT” added to the title, with no mention of business sign-off at all.

This guide gives you a complete, free template you can copy right now. It also covers how to fill in each section, when a simple one-pager is enough, and where a tool like Tuskr fits once you’re managing UAT across more than a single spreadsheet.

What Is a User Acceptance Test Plan Template?

A user acceptance test plan template is a reusable document structure that lays out how business users or end customers will test a system before it goes live. It covers who tests, what gets tested, the environment they’ll use, and the criteria for calling UAT complete.

A User Acceptance Testing (UAT) plan is different from a UAT test script or test case list. The plan sets the rules of the engagement. Test cases and scripts are the actual steps testers click through, written against that plan.

Most teams need this document for one reason: UAT is the last checkpoint before release. Without an agreed plan, business sign-off turns into an argument about what was supposed to be tested in the first place.

Bottom line:

If a stakeholder asks why a defect slipped through after sign-off, your written plan is what answers that question instead of you.

What Should a User Acceptance Test Plan Template Include?

A complete UAT test plan template covers eight parts. Skip any of these and you’ll end up settling an argument mid-project that should have been settled on day one.

  • Purpose and objectives – why this round of UAT exists and what “done” looks like
  • Scope – features in scope, and what’s explicitly excluded
  • Entry and exit criteria – what must be true before testing starts, and before it can close
  • Roles and responsibilities – who tests, who approves, who fixes defects
  • Test environment and test data – where testing happens and what data testers use
  • Schedule and milestones – start and end dates, plus review checkpoints
  • Defect process – how issues get logged, prioritized, and resolved
  • Sign-off – who approves the release and on what basis

Bottom line:

Leave the actual test cases out of this document. Those belong in a separate test case or test script template, or in your test management tool, so the plan stays short enough that people actually read it.

Free User Acceptance Test Plan Template

Copy the structure below into a doc, wiki page, or spreadsheet. Replace every bracket with your own project details. This is the same sample User Acceptance Test Plan structure used across most enterprise UAT processes, just without the gate in front of it.

Prefer a ready-made file instead of copying section by section? Grab the .docx version of this template here and just fill in the brackets.

Document Control

Field Details
Project Name [Enter project name]
Product / Application [Enter product name]
Release / Version [Enter release version]
Prepared By [Name, role]
Prepared Date [Enter date]
UAT Start Date [Enter date]
UAT End Date [Enter date]
Approval Date [Enter date]

1. Purpose and Objectives

This User Acceptance Test Plan explains how the team will test the product before release. The purpose of UAT is to confirm that the software works correctly for real users and meets business needs.

[State why this UAT round exists and what success looks like.]

Example: This UAT round confirms the new expense approval workflow matches finance’s sign-off requirements before go-live on [date].

This plan helps the team understand:

  • What will be tested
  • Who will test it
  • When testing will happen
  • How test results will be tracked
  • When the product is ready for approval

2. Project Overview

Project / Feature Name: [Enter project or feature name]

Short Description: [Write a short description of the product, feature, or release.]

Example: This release adds a new checkout flow. Users should be able to add products to the cart, apply discounts, make payment, and receive an order confirmation email.

Business Goal: [Explain why this release is important.]

Example: The goal is to make checkout easier and reduce failed orders

3. UAT Objectives

The objectives of this UAT are:

  • Confirm that the product works as expected for business users.
  • Check that important user flows are working correctly.
  • Find serious issues before release.
  • Confirm that business requirements are met.
  • Get final approval before going live.

4. Scope

4.1 In Scope

Area / Feature What Will Be Tested
[Feature 1] [Describe what will be tested]
[Feature 2] [Describe what will be tested]
[Feature 3] [Describe what will be tested]
Login (Example) User can log in with valid email and password
Checkout (Example) User can complete an order
Email Notification (Example) User receives confirmation email after order

4.2 Out of Scope

Area / Feature Reason
[Feature] [Reason why it is not included]
[Feature] [Reason why it is not included]
Admin reports (Example) Not part of this release
Mobile app (Example) Will be tested in a separate UAT cycle

5. Roles and Responsibilities

Role Name Responsibility
Product Owner [Name] Confirms business requirements and approves UAT
UAT Lead [Name] Manages UAT planning and execution
Business Tester [Name] Runs test cases and shares feedback
QA Tester [Name] Supports test case preparation and defect tracking
Developer [Name] Fixes issues found during UAT
Project Sponsor / Approver [Name] Gives final UAT sign-off

6. Entry Criteria

UAT can start only when the following items are ready:

Entry Criteria Status
Development is complete [Yes / No]
QA / system testing is complete with no open critical defects [Yes / No]
Critical bugs are fixed [Yes / No]
UAT environment is ready and matches production configuration [Yes / No]
Test users have login access [Yes / No]
UAT test cases are reviewed and approved [Yes / No]
Test data is loaded and validated [Yes / No]
Business users are available for UAT [Yes / No]

7. Exit Criteria

UAT can be completed when the following conditions are met:

Exit Criteria Status
All planned UAT test cases have been executed [Yes / No]
Zero open critical or high-severity defects remain [Yes / No]
Failed test cases are reviewed and accepted or resolved [Yes / No]
Business stakeholders have approved results [Yes / No]
UAT summary report is prepared [Yes / No]
Final sign-off is completed [Yes / No]

8. Test Environment and Test Data

Item Details
UAT Environment URL [Enter URL]
Browser / Device [Chrome, Firefox, Safari, mobile, etc.]
Test User Accounts [List user accounts or roles]
Test Data Location [Enter location of test data]
Payment / Email / API Setup [Mention any special setup]
Support Contact [Name / email / team]

Test Data:

Data Type Example Owner
Test users [user1@example.com] [Name]
Customer records [Sample customer details] [Name]
Product data [Sample product details] [Name]
Order data [Sample order details] [Name]
Payment data [Sandbox / test payment details] [Name]

9. Schedule and Milestones

Activity Owner Start Date End Date Status
Prepare UAT plan [Name] [Date] [Date] [Not Started / In Progress / Done]
Test case review and approval [Name] [Date] [Date] [Not Started / In Progress / Done]
Test environment ready [Name] [Date] [Date] [Not Started / In Progress / Done]
Prepare test data [Name] [Date] [Date] [Not Started / In Progress / Done]
UAT testing starts [Name] [Date] [Date] [Not Started / In Progress / Done]
Defect retest window [Name] [Date] [Date] [Not Started / In Progress / Done]
Final sign-off [Name] [Date] [Date] [Not Started / In Progress / Done]

10. UAT Test Scenarios

Scenario ID Scenario Name Business Requirement Priority
UAT-SC-001 [Scenario name] [Requirement] [High / Medium / Low]
UAT-SC-002 [Scenario name] [Requirement] [High / Medium / Low]
UAT-SC-003 [Scenario name] [Requirement] [High / Medium / Low]
UAT-SC-001 (Eg) User login User should be able to log in High
UAT-SC-002 (Eg) Password reset User should be able to reset password Medium
UAT-SC-003 (Eg) Place order User should be able to complete checkout High

11. UAT Test Case Template

Field Details
Test Case ID [UAT-TC-001]
Test Case Title [Enter test case title]
Related Scenario [UAT-SC-001]
Business Requirement [Enter requirement]
Preconditions [What should be ready before testing]
Test Steps [Step-by-step user actions]
Expected Result [What should happen]
Actual Result [What actually happened]
Status [Pass / Fail / Blocked / Not Run]
Tested By [Name]
Test Date [Date]
Comments [Notes]

12. Defect Management

When a test case fails, create a defect with clear details:

Field Details
Defect ID [BUG-001]
Related Test Case [UAT-TC-001]
Defect Title [Short title]
Description [Explain the issue]
Steps to Reproduce [Steps to see the issue again]
Expected Result [What should happen]
Actual Result [What happened]
Severity [Critical / High / Medium / Low]
Owner [Developer / Team]
Status [Open / Fixed / Retest / Closed]
Comments [Notes]

Severity levels:

Severity Definition Typical SLA
Critical Blocks testing or core business function, no workaround Fix before retest window
High Major function impaired, workaround exists Fix before exit
Medium Minor function affected, low business impact Fix or accept before release
Low Cosmetic or edge case Backlog for a later release

13. UAT Risks

Risk Impact Action Plan
Business users are not available UAT may be delayed Confirm schedule before UAT starts
Test data is incomplete Test cases may fail incorrectly Prepare test data before execution
Too many critical defects Release may be delayed Review defects daily
UAT environment is unstable Testing may stop Assign support owner
Requirements are unclear Users may test the wrong behavior Review requirements before UAT

14. UAT Result Summary

Metric Value
Total test cases [Number]
Passed test cases [Number]
Failed test cases [Number]
Blocked test cases [Number]
Not run test cases [Number]
Open critical defects [Number]
Open high defects [Number]
UAT completion percentage [Percentage]
📥 Download the Full UAT Test Plan Template

17 sections: purpose, scope, roles, entry/exit criteria, defect management & sign-off

Pre-built UAT test case and defect logging tables
UAT result summary and decision tracker
No email form. No paywall. Free to use.

Free download. No signup required.

Simple vs. Software UAT Test Plan: Which Do You Need?

Not every project needs all eight sections in full. A two-week internal tool rollout and a regulated banking release call for different versions of the same document.

Simple UAT Plan Full Software UAT Plan
Best for Small internal tools, single-team rollouts Customer-facing software, multi-team or regulated releases
Sections needed Purpose, scope, schedule, sign-off All sections, including formal entry/exit criteria
Typical length One page Three to six pages
Sign-off Single approver Multiple stakeholders, often with a signature log
Example A new internal reporting dashboard A core banking module, an ERP rollout, or a Salesforce implementation

Platform-specific projects add their own wrinkles too. A Salesforce test plan template, for instance, usually needs an extra section for sandbox-to-production data migration that a generic plan won’t cover.

Bottom line:

Start with the simple version. Add sections only when a stakeholder, an auditor, or a past incident gives you a reason to.

How to Fill Out Your UAT Test Plan, Step by Step

  1. Draft purpose and scope first. Get one sentence of agreement from the project sponsor before writing anything else. Scope disagreements are the most common reason UAT plans get rewritten mid-project.

  2. Set entry and exit criteria with QA, not just business. QA already knows what “system testing complete” actually means. Skipping this step is how UAT starts on a build that was never ready.

  3. Assign roles by name, not by team. “QA team” is not a responsibility. “Maria, QA Lead, reviews and approves test cases by Friday” is.

  4. Confirm the test environment a week before testing starts. Test the test environment. A broken login page on day one of UAT wastes a tester’s entire morning.

  5. Build the schedule backward from go-live. Work back from the release date, leave a retest window after defect fixes, and only then set the testing start date.

  6. Write the defect process before the first bug shows up. Decide where defects get logged and who triages severity before testing starts, not during it.

  7. Circulate the plan for review before testing begins. Every approver listed in the roles section should see the final plan and agree to it in writing, even if that’s just an email reply.

UAT Test Plan vs. Test Strategy vs. Test Cases

These three documents get confused constantly, and mixing them up is why some “test plans” run to forty pages nobody reads.

A test strategy sits above all of this. It’s a program-level document that states the overall testing approach to be followed across a project: which test types apply (functional, regression, UAT), what tools get used, and how testing fits the release cycle.

A UAT test plan sits one level down. It applies that strategy to one specific UAT round: this project, this release, this set of testers, these dates.

Test cases and test scripts sit below the plan. A typical UAT test script lists a test ID, the business scenario it covers, the steps to follow, the expected result, the actual result, and a pass or fail status. All UAT test cases tied to a release should map back to a requirement in the plan, so a failed case always points to something the plan can be checked against.

Bottom line:

If you’re rewriting your test strategy for every release, you’re doing it wrong. The strategy stays fairly stable. The plan and the test cases change every time.

Common Mistakes That Sink UAT

Most failed UAT rounds don’t fail because nobody wrote a plan. They fail because of how that plan got used.

  • The plan exists, but no business tester has actually read it. A plan that lives in a folder nobody opens is the same as no plan at all.
  • The template is too generic for the actual product. A test plan built for “software” in general won’t ask the questions specific to your payment flow, your data migration, or your compliance requirements.
  • It’s gated behind a download form. Teams end up using whatever PDF a junior tester found first, not the version actually suited to the project, because the better template took too long to access.
  • Sign-off happens before retesting fixed defects. A critical defect gets “fixed,” nobody retests it, and it reappears in production a week after release.
  • Nobody owns updating it once testing starts. The plan says testing ends Friday. It’s still running the following Wednesday, and the document was never touched.

How Tuskr Helps You Plan and Track UAT

A document template gets you started. It doesn’t track who’s actually finished their assigned cases, or flag that 40% of your test plan still has no results three days before go-live.

Tuskr’s Test Plans feature lets you group related test cases into a structured plan, then spin up multiple test runs from that same plan instead of rebuilding it for every release. Reusable templates mean a recurring UAT cycle doesn’t start from a blank screen each quarter.

Once testing starts, burndown charts and project dashboards show execution progress against the plan in real time, so the question “are we on track for Friday’s exit criteria” has an actual answer instead of a guess. Tuskr’s AI features can also generate test cases from requirements and flag coverage gaps before testers start clicking through scripts, and a PDF status report gives stakeholders something concrete to review before signing off.

Platform Rating Reviews / Notes
G2 4.6 / 5 585 reviews — 78% five-star
Capterra 4.7 / 5
GetApp 4.7 / 5
Software Advice 4.7 / 5
TrustRadius 9.8 / 10

This isn’t just Tuskr’s own claim. Reviewers on G2 also flag advanced reporting customization as an area for improvement, which is a fair trade-off for teams that want a tool simpler than enterprise platforms like TestRail or PractiTest.

One G2 reviewer, a technical team lead, described how moving test cases out of scattered files and into Tuskr made it easier to track test runs and collaborate with the rest of the team during QA reviews. That’s the gap a written plan alone can’t close: a document tells people what to do, but a shared system shows whether they actually did it.

Tuskr's Test Plan view, showing grouped test cases and a test run created from that plan
Tuskr’s Test Plan view, showing grouped test cases and a test run created from that plan

If you’re managing UAT across more than a spreadsheet, you can build this exact plan inside a free Tuskr trial, no credit card required, or book a 30-minute demo to see how test plans, test runs, and AI-assisted test case generation work together for your team.

FAQ

What’s the difference between a UAT test plan and a UAT test script?

The test plan is the strategy document: scope, criteria, roles, and schedule for the whole UAT round. A test script is one specific set of steps a tester follows, with an expected result and a pass/fail outcome. You write the plan once and build many scripts against it.

Who should write the UAT test plan?

Usually a business analyst, project manager, or QA lead drafts it, then circulates it to business stakeholders and the development team for review. The people listed in the roles section should see the final version before testing starts, not after.

How long should a UAT phase last?

It depends on scope, but most UAT rounds run one to three weeks, including a short retest window for fixed defects. Regulated or multi-team releases often run longer to allow for formal sign-off cycles.

Can I run UAT in Excel instead of a dedicated tool?

Yes, for a small project with a handful of testers and test cases. Excel gets harder to manage once you have multiple testers working in parallel, defects to cross-reference, and stakeholders who want a live status view instead of an emailed spreadsheet.

What should a UAT sign-off document include?

The agreed exit criteria, a summary of test results, any open defects and their accepted risk level, and a signature or written approval from each named approver, with a date.

Does UAT replace system or QA testing?

No. System and QA testing check whether the software works as built. UAT checks whether it solves the business problem it was built for. Skipping straight to UAT without earlier testing usually means business testers end up finding bugs that should have been caught earlier.

Final Thoughts

A user acceptance test plan template only does its job if people actually use it: read it, follow it, and update it as testing happens. Copy the structure above, fill in your own scope and dates, and circulate it before testing starts rather than after.

For a one-off UAT round, a doc or spreadsheet built from this template is enough. For recurring releases, multiple testers, or business sign-off you need to defend later, a tool like Tuskr keeps that same plan alive instead of letting it go stale in a shared drive.

📥 Download Your Free UAT Test Plan Template

✓ Purpose, scope, roles and responsibilities
✓ Entry and exit criteria checklists
✓ Test case and defect management tables
✓ UAT schedule, result summary and sign-off log
✓ Bonus: UAT test case tracker sheet

Free download. No signup required.

Try Tuskr

Start a free Tuskr trial · Book a 30-minute demo

See how test plans, test runs, and AI-assisted test case generation work together for your team.